Bike Oakland & Alameda: 2.5 Ferry Stations
From YouTube Channel: August 22, 2020 at 06:00AM
ONN – SF Bay Area Bicycle Is Back: Bike Oakland & Alameda: 2.5 Ferry Stations
2020-07-16: 26.6 mile, 290 ft gain, ride attempting to visit the 3 closest ferry stations to me but had to bail half-way to the 3rd one due to calf cramps. Starting on 55th Ave and El Camile/Kingsland/Trask to Foothill, 40th Ave, International, High St & Bridge onto Alameda Island to take Fernside across the bridge to Bay Farm Island and around the shore to the Harbor Bay Ferry Terminal, then back to Alameda and Shore Line Dr and through the parks around Crab Cove to Central Ave which turns into Main St and to the Alameda Main St Ferry and then wandering around trying to find my way through the construction along the north shore of Alameda eventually taking Willie Stargell Ave to discover that the harrowing Posey Tube is closed, so it’s back to further wandering to get to the Park St Bridge back over to Oakland. Taking Embarcadero it’s clear both calves aren’t going to cooperate so rather than continuing on to the Jack London Ferry, it’s 5th Ave, E 8th St, E 12th St, step over to Bancroft Ave back to 55th Ave.
Note from Zennie62Media and Oakland News Now: this video-blog post demonstrates the full and live operation of the latest updated version of an experimental Zennie62Media , Inc. mobile media video-blogging system network that was launched June 2018. This is a major part of Zennie62Media , Inc.’s new and innovative approach to the production of news media. What we call “The Third Wave of Media”. The uploaded video is from a vlogger with the Zennie62 on YouTube Partner Channel, then uploaded to and formatted automatically at the Oakland News Now site and Zennie62-created and owned social media pages. The overall objective is smartphone-enabled, real-time, on the scene reporting of news, interviews, observations, and happenings anywhere in the World and within seconds and not hours. Now, news is reported with a smartphone: no heavy and expensive cameras or even a laptop are necessary. The secondary objective is faster, and very inexpensive media content news production and distribution. We have found there is a disconnect between post length and time to product and revenue generated. With this, the problem is far less, though by no means solved. Zennie62Media is constantly working to improve the system network coding and seeks interested content and media technology partners.